National Highway and CPEC road packages across Balochistan and Sindh — rehabilitation, dualization and reconstruction, with HKH structuring the joint ventures and acting as Authorised Representative for the international lead contractors.
2026 · Sindh
Hyderabad–Sukkur M-6 Motorway
306 km, six-lane motorway — Sections 3, 4 & 5
Construction of the Hyderabad–Sukkur six-lane motorway, with HKH's Managing Director acting as Authorised Representative for the international lead contractors on three sections.
Overview
Construction of the Hyderabad–Sukkur 306 km, six-lane motorway. HKH provided consultancy for the formation of the joint venture between Xingtai Road & Bridge Construction Group and Progressive Technical Associate Private Limited. Captain Abdul Khaliq Khar, MD of HKH Pvt Ltd, acts as Authorised Representative in Pakistan for Xingtai Road & Bridge Construction Group.
Sections Delivered
- Section 4 — Padidan (Noushero Feroz) to Ranipur, 60.90 km
- Section 5 — Ranipur to Sukkur, 59.88 km
- Section 3 — Nawabshah to Naushahro Feroz, Km 250+500 to Km 315+300, approximately 64.61 km, delivered through the SAMA Construction for Trading and Contracting (C.J.S. Co.) joint venture
Joint Venture Structure (Sections 4 & 5)
- Lead Contractor: Xingtai Road & Bridge Construction Group Co., Ltd — China
- Pakistani Partner: Progressive Technical Associate Private Limited
- Authorised Representative: Capt. Abdul Khaliq Khar, Managing Director, HKH Pvt Ltd
- Client: National Highway Authority, Government of Pakistan
Joint Venture Structure (Section 3)
- Lead Contractor: SAMA Construction for Trading and Contracting (C.J.S. Co.) — Riyadh
- Pakistani Partner: Progressive Technical Associate Private Limited
- Chairman & CEO: Mr. Sultan Salman Saleem Al Saedi
Signed Authority
Powers of attorney dated 26 January 2026 (Xingtai, Sections 4 & 5) and an authority letter dated 7 July 2026, attested by the Ministry of Foreign Affairs of Saudi Arabia and the Embassy of Pakistan in Riyadh (SAMA, Section 3), appointed Captain Abdul Khaliq Rabbani Khar to negotiate, sign and submit joint venture agreements and bids to the NHA on the respective partners' behalf.
Outcomes
- Section 4 (60.90 km) and Section 5 (59.88 km) joint ventures formed with Xingtai Road & Bridge Construction Group
- Section 3 (64.61 km) joint venture formed with SAMA Construction for Trading and Contracting
- HKH's Managing Director appointed Authorised Representative in Pakistan for both international lead contractors
2026 · Balochistan
Khuzdar–Kuchlak, N-25
Dualization of National Highway N-25, Sections III & IV
Dualization of two sections (nearly 139 km combined) of the Khuzdar–Kuchlak N-25 highway, converting congested single-lane roads into a modern four-lane dual carriageway.
Overview
Dualization of the Khuzdar–Kuchlak section of National Highway N-25 (total length 330.52 km), delivered through the ZIEC/PTA joint venture structured by HKH.
Section III
Km 102+000 to Km 171+900 — a 69.9 km package, contract value Rs 1,140.96 mn, expanding a highly congested, accident-prone route into a modern four-lane dual carriageway.
Section IV
Km 171+900 to Km 121+120 — a 69 km package, contract value Rs 12.8 bn, converting a single-lane corridor into a four-lane divided highway to alleviate traffic congestion, decrease accident rates, and build a key trade path linking Karachi, Quetta and Chaman.
Works
Asphalt laying, rock excavation, grading and deck reinforcement (Section III, May 2026); excavation at the Kalat section and compaction of the completed formation (Section IV, June 2026).
Outcomes
- Section III (69.9 km) awarded, contract value Rs 1,140.96 mn
- Section IV (69 km) awarded, contract value Rs 12.8 bn
- Joint venture between Zhongding International Engineering Co. and Progressive Technical Associates
2026 · South Balochistan
Awaran–Jhal Jhao Road
CPEC Central Alignment, South Balochistan
Rehabilitation and up-gradation of the 54.80 km Awaran–Jhal Jhao Road under the CPEC central alignment, a joint venture structured by HKH.
Overview
Rehabilitation and up-gradation of the 54.80 km long Awaran–Jhal Jhao Road — a critical infrastructure initiative under the China-Pakistan Economic Corridor (CPEC) central alignment in South Balochistan, executed by the ZIEC-PTA joint venture. HKH (Pvt) Ltd provided consultancy service for the formation of the joint venture delivering this package.
Package Details
- 55 km section length awarded by the National Highway Authority
- Rs 5.15 bn contract value
- ZIEC / PTA — Zhongding International Engineering Co. and Progressive Technical Associates
Works
Excavation and earthworks along the alignment, hill cutting, rock excavation at the cut face, and formation-level work.
Outcomes
- 55 km road package awarded by NHA, valued at Rs 5.15 bn
- Joint venture between Zhongding International Engineering Co. and Progressive Technical Associates formed with HKH consultancy
2026 · Sindh
N-5 Reconstruction — Ranipur to Rohri
Pakistan Resilient Recovery, Rehabilitation and Reconstruction Framework Project, Phase IA
Reconstruction of a 70 km section of National Highway N-5 between Ranipur and Rohri, with HKH's Managing Director serving as Authorised Representative for the Riyadh-based lead contractor.
Overview
Reconstruction of National Highway N-5 under the Pakistan Resilient Recovery, Rehabilitation and Reconstruction Framework Project — Phase IA (141 km), Section 2: Ranipur–Rohri Road. HKH provided consultancy for formation of the joint venture between SAMA Construction for Trading and Contracting (C.J.S. Co.) and Progressive Technical Associate Private Limited.
Package Details
- 141 km — Phase IA framework project
- 70 km — Section 2: Ranipur–Rohri Road
Joint Venture Structure
- Lead Contractor: SAMA Construction for Trading and Contracting (C.J.S. Co.) — Riyadh
- Pakistani Partner: Progressive Technical Associate Private Limited
- Authorised Representative: Capt. Abdul Khaliq Khar, Managing Director, HKH Pvt Ltd
- Framework: Pakistan Resilient Recovery, Rehabilitation and Reconstruction Framework Project
Captain Abdul Khaliq Khar serves as SAMA's Authorised Representative in Pakistan for this package.
Outcomes
- 70 km Ranipur–Rohri section joint venture formed under the national reconstruction framework
Infrastructure Projects — At a Glance
Of carriageway across four packages
National Highway and CPEC packages
Value of NHA packages advised on
Provinces — Sindh and Balochistan
Capability
What HKH Brings to Road Projects
HKH structures joint ventures between Pakistani and international contractors, and acts as Authorised Representative for foreign lead firms bidding into National Highway Authority packages — carrying a project from partner selection and prequalification through to dealings with NHA and the project authorities.
- Joint-venture structuring and partner matchmaking
- Authorised Representative for international lead contractors
- Prequalification and bid documentation with NHA
- Pakistan Engineering Council licensed — No. 8027, Category C3